1. Before starting the electrical, water pump, water, fan, air pressure and mechanical operation system is normal. If there is a problem, should be excluded before heating to heat up.

2. Heating up to 300 ℃ start fan, pump, running belt, open the pressure valve, start feeding.

3. The material (gear) are flat in the net belt, not allowed to overlap, not allowed to turn the whole (gear) on the Internet to be placed, not allowed to throw the gear on the net, to gently, to protect the gear, Care equipment.

4. Furnace dissolution of more than the provisions should be promptly repaired. It is forbidden to melt in a deep crucible,

5. When feeding, should check whether the charge of incandescent and other items mixed into, if it should be promptly removed. It is strictly forbidden to add cold material and warm material directly to molten iron. When the molten liquid is filled to the upper part of the crucible, it is strictly forbidden to add a large piece of material to prevent the capping, and the operator’s face should avoid the mouth.

6. The site and the furnace before the pit should be no obstacles, no water, to prevent iron ore floor explosion.

7. Tilt the furnace will be injected into the hanging iron when the fan should stop the power supply, and then slow down the manipulation of the machine, hanging to be preheated, baking dry.

8. Lifting ladle should not be too fast, hot metal should not be installed too full, pouring process, should be hanging mouth and the injection port has a certain distance, hanging bag, pouring, walking should be with each other Do not hurry The Such as molten iron spilled to be safe to put down not allowed to throw the package.

9. Mixing furnace and ramming crucible is strictly prohibited iron oxide mixed iron, pound crucible must be dense.

10. IF room should be kept clean, is strictly prohibited flammable and explosive materials into the room, no smoking.

11. After the opening of the furnace should be cleaned, to keep the furnace clean, before work should be left to the successor, IF sensor and furnace cooling in the shutdown four hours before the water can be cooled.
Lianguan successfully developed the high speed feeding and filling device, wpc new profile production line, PET/PE / PP washing line with water, and a number of recycling devices in domestic leading position, also solved the problem of second pollution caused by washing with water.

Category: PE PP washing line News,News

Leave a Reply

Your email address will not be published. Required fields are marked *